{"course":{"id":"115121701J02","name":"生產管理(含實習)","enroll_type":"必修","general_type":"","dept":"四技工管系","grade":2,"class_group":"甲","teacher":"郭宜雍","credit":3,"hour":4,"time":[{"day":1,"section":[1,2]},{"day":3,"section":[1,2]}],"classroom":"","max":60,"min":10,"remark":"Partially taught in English","alt_for":"","courses":""},"detail":[["指定教材","Stevenson W.J. 著，何應欽 編譯，作業管理（全新台灣版）"],["參考教材","Stevenson W.J., Operations Management 10th, McGrawHill"],["成績評量標準","期中考：50％\n期末考：50％\n實習成績：10%\n出席及課堂表現：10％\n滿分120(超過以99分計算)"],["教學方法","理論講授,個人實驗(實作)"],["教學目標","培養學生具備生產與作業管理之基礎及專業知識。"]],"office_time":[["郭宜雍","星期五：13：00∼17：00"]],"schedule":[["2026/09/07","1","2","2","郭宜雍","課程講解","","評分標準、實習方式",""],["2026/09/09","1","2","2","郭宜雍","作業管理導論","","作業管理簡介及說明",""],["2026/09/14","1","2","2","郭宜雍","競爭力、策略與生產力","","生產力與策略",""],["2026/09/16","1","2","2","郭宜雍","競爭力、策略與生產力","","生產力計算方式",""],["2026/09/21","1","2","2","郭宜雍","預測","","預測概念與簡介",""],["2026/09/23","1","2","2","郭宜雍","預測","實習作業","介紹移動平均、加權移動平均法",""],["2026/09/28","1","2","2","郭宜雍","教師節放假","放假","","教師節"],["2026/09/30","1","2","2","郭宜雍","預測","","介紹指數平滑",""],["2026/10/05","1","2","2","郭宜雍","預測","","",""],["2026/10/07","1","2","2","郭宜雍","產品服務與設計","","生命週期、永續性、QFD、Kano",""],["2026/10/12","1","2","2","郭宜雍","產品服務與設計","實習作業","生命週期、永續性、QFD、Kano",""],["2026/10/14","1","2","2","郭宜雍","產能規劃","","工程及服務設計",""],["2026/10/19","1","2","2","郭宜雍","產能規劃","(調課)","自製或外包",""],["2026/10/21","1","2","2","郭宜雍","產能規劃","實習作業","方案評估方法（損益平衡）",""],["2026/10/26","1","2","2","郭宜雍","光復節","放假","方案評估方法（損益平衡）","光復節"],["2026/10/28","1","2","2","郭宜雍","製程選擇與設施布置","","設施布置種類",""],["2026/11/02","1","2","2","郭宜雍","製程選擇與設施布置","","生產線平衡",""],["2026/11/04","1","2","2","郭宜雍","製程選擇與設施布置","實習作業","生產線平衡",""],["2026/11/09","1","2","2","郭宜雍","期中考","期中考","期中考",""],["2026/11/11","1","2","2","郭宜雍","期中考","期中考(補課10/19)","期中考",""],["2026/11/16","1","2","2","郭宜雍","總體規劃","","需求不均勻之基本策略",""],["2026/11/18","1","2","2","郭宜雍","總體規劃","","主排程",""],["2026/11/23","1","2","2","郭宜雍","存貨管理","","經濟訂購量（一）",""],["2026/11/25","1","2","2","郭宜雍","存貨管理","","經濟訂購量（二）",""],["2026/11/30","1","2","2","郭宜雍","存貨管理","","再訂購點的計算方式",""],["2026/12/02","1","2","2","郭宜雍","存貨管理","","單期訂貨方法介紹",""],["2026/12/07","1","2","2","郭宜雍","MRP與ERP","","物料需求規劃流程",""],["2026/12/09","1","2","2","郭宜雍","MRP與ERP","實習作業","物料需求規劃",""],["2026/12/14","1","2","2","郭宜雍","精實生產","","精實生產簡介",""],["2026/12/16","1","2","2","郭宜雍","精實生產","","精實生產簡介",""],["2026/12/21","1","2","2","郭宜雍","供應練管理","","供應練管理簡介",""],["2026/12/23","1","2","2","郭宜雍","供應練管理","","長鞭效應",""],["2026/12/28","1","2","2","郭宜雍","排程","","派工方法",""],["2026/12/30","1","2","2","郭宜雍","排程","","強森法則",""],["2027/01/04","1","2","2","郭宜雍","期末考","期末考","期末考",""],["2027/01/06","1","2","2","郭宜雍","期末考","期末考","期末考",""]]}