{"course":{"id":"113122705301","name":"專案管理","enroll_type":"選修","general_type":"","dept":"四技經管系","grade":3,"class_group":"甲","teacher":"林裕勛","credit":3,"hour":3,"time":[{"day":3,"section":[7,8]},{"day":4,"section":[2,3]},{"day":5,"section":[2,3]}],"classroom":"","max":50,"min":10,"remark":"帶狀課程7/1-8/30甲乙合班","alt_for":"","courses":""},"detail":[["指定教材","賴奎魁，張善斌審校，吳宜錚編譯，Gray & Larson 著，專案管理 (Project Management:：The Managerial Process)，第８版，華泰文化，台北，2023。"],["參考教材","Meredith & Mantel著/賴奎魁審譯，專案管理，第1版，雙葉書廊，台北，2009。 \n曾清枝，專案管理:以系統手法管理專案，第３版，雙葉書廊，台北，2024。"],["成績評量標準","平時成績(課堂參與討論佔10%+平時考10次佔30%) \n期中考成績(佔30%) \n期末考成績(佔30%)"],["教學方法","理論講授,個案分析,分組實驗(實作),個人實驗(實作)"],["教學目標","此課程目的在養成學生對專案管理的實務分析以及報告撰寫的能力。"]],"office_time":[["林裕勛","周2到周5第1節。"]],"schedule":[["2024/07/03","7","8","2","林裕勛","課程簡介","","課程介紹","分組"],["2024/07/04","2","3","2","林裕勛","第1章 現代專案管理","","現代專案管理",""],["2024/07/05","2","3","2","林裕勛","第2章 組織策略與專案選擇","","組織策略與專案選擇","小組實作(1)"],["2024/07/10","7","8","2","林裕勛","第2章 組織策略與專案選擇","","組織策略與專案選擇",""],["2024/07/11","2","3","2","林裕勛","第3章 組織：結構與文化","","組織：結構與文化",""],["2024/07/12","2","3","2","林裕勛","第3章 組織：結構與文化","","組織：結構與文化","小組實作(2)"],["2024/07/17","7","8","2","林裕勛","第4章 定義專案","","定義專案",""],["2024/07/18","2","3","2","林裕勛","第4章 定義專案","","定義專案",""],["2024/07/19","2","3","2","林裕勛","第5章 估算專案時間與成本","","估算專案時間與成本","小組實作(3)"],["2024/07/24","7","8","2","林裕勛","第5章 估算專案時間與成本與期中考","","估算專案時間與成本",""],["2024/07/25","2","3","2","林裕勛","第5章 估算專案時間與成本","","估算專案時間與成本","小組實作(4)"],["2024/07/26","2","3","2","林裕勛","第5章 估算專案時間與成本","","估算專案時間與成本",""],["2024/07/31","7","8","2","林裕勛","期中考","繳交期中報告","","期中考"],["2024/08/01","2","3","2","林裕勛","第6章 訂定專案時程","","訂定專案時程","小組實作(5)"],["2024/08/02","2","3","2","林裕勛","第6章 訂定專案時程","","訂定專案時程",""],["2024/08/07","7","8","2","林裕勛","第7章 管理風險","","管理風險","小組實作(6)"],["2024/08/09","2","3","2","林裕勛","第8章 資源與成本排程","","資源與成本排程",""],["2024/08/10","2","3","2","林裕勛","第8章 資源與成本排程","","資源與成本排程",""],["2024/08/14","7","8","2","林裕勛","第9章 縮減專案工期","","縮減專案工期","小組實作(7)"],["2024/08/15","2","3","2","林裕勛","第10章 領導力：成為有效能的專案經理","","領導力：成為有效能的專案經理",""],["2024/08/16","2","3","2","林裕勛","第11章 管理專案團隊","","管理專案團隊",""],["2024/08/21","7","8","2","林裕勛","第12章 外包：管理組織間的關係","","外包：管理組織間的關係","小組實作(8)"],["2024/08/22","2","3","2","林裕勛","第13章 進度與績效的衡量和評估","","進度與績效的衡量和評估",""],["2024/08/28","7","8","2","林裕勛","第15章 敏捷式專案管理","","敏捷式專案管理","小組實作(9)"],["2024/08/29","2","3","2","林裕勛","第16章 國際專案","","國際專案",""],["2027/08/23","2","3","2","林裕勛","第14章 專案結束","","專案結束",""],["2027/08/30","2","3","2","林裕勛","期末報告與期末考","繳交期末報告","各組期末報告","期末考"]]}