{"course":{"id":"113121700V01","name":"採購管理","enroll_type":"選修","general_type":"","dept":"四技工管系","grade":4,"class_group":"甲","teacher":"林俊雄","credit":3,"hour":3,"time":[{"day":2,"section":[7]},{"day":3,"section":[5,6]}],"classroom":"","max":50,"min":10,"remark":"甲乙合班","alt_for":"","courses":""},"detail":[["指定教材","林俊雄，林晋寬，許獻佳，資材管理理論與實務，2020，明志科技大學管理暨設計學院編輯，深智數位，初版，台北市。"],["參考教材","1.自編-寄庫作業專案改善\n2.瓦楞紙箱驗收作業檢核\n3.倉儲管理錯料事故分析"],["成績評量標準","案例分析：25%\n期末考試：25%\n分組討論：40%\n課程參與10%"],["教學方法","理論講授,實務講授,個案分析,分組實驗(實作)"],["教學目標","本課程旨在提供學生了解採購管理理論及實務運用，包括採購相關作業之流程、制度設訂及異常之管理，其範圍含材料編號及從資材需求的源起以至用料付款等，以建立對於採購管理的實務專業及其應用，也期望透過本課程讓學生能運用在日常需求管理以及就業後面臨的採購及供應鏈管理作業。"]],"office_time":[["林俊雄","星期四下午 13:00~17:00"]],"schedule":[["2024/09/10","7","7","1","林俊雄","課程介紹與設計分析設計","加退選","課程內容/分組評分方式/教學進度",""],["2024/09/11","5","6","2","林俊雄","採購管理基礎知識建構：中小至大企業","分組團隊","不同規模大小採購管理",""],["2024/09/17","7","7","1","林俊雄","中秋節","","放假一天",""],["2024/09/18","5","6","2","林俊雄","採購管理基礎知識建構：中小至大企業","","不同規模大小採購管理",""],["2024/09/24","7","7","1","林俊雄","材料料號編碼原則及範例","類產線工廠材原料及MRO編碼","分類編號之前提條件/材料分類/材料編號/材料分類編號範例",""],["2024/09/25","5","6","2","林俊雄","材料料號編碼原則及範例","類產線工廠材原料及MRO編碼","分類編號之前提條件/材料分類/材料編號/材料分類編號範例",""],["2024/10/01","7","7","1","林俊雄","存量管制","","定期/定量不同存量管理模式",""],["2024/10/02","5","6","2","林俊雄","存量管制","","定期/定量不同存量管理模式",""],["2024/10/08","7","7","1","林俊雄","請購管理","分組填寫目標學習單、分組角色扮演報告","請購作業流程/請購形式的分類/請購單的內容/請購作業常見問題",""],["2024/10/09","5","6","2","林俊雄","請購管理","分組填寫目標學習單、分組角色扮演報告","請購作業流程/請購形式的分類/請購單的內容/請購作業常見問題",""],["2024/10/15","7","7","1","林俊雄","國內採購管理","分組填寫目標學習單、分組角色扮演報告","採購作業流程/採購作業方法分類/採購進度及交期管制",""],["2024/10/16","5","6","2","林俊雄","國內採購管理","分組填寫目標學習單、分組角色扮演報告","採購作業流程/採購作業方法分類/採購進度及交期管制",""],["2024/10/22","7","7","1","林俊雄","供應商管理","分組填寫目標學習單、分組角色扮演報告","供應商開發與建立/供應商選擇/供應商評核/供應商分級及運用",""],["2024/10/23","5","6","2","林俊雄","供應商管理","分組填寫目標學習單、分組角色扮演報告","供應商開發與建立/供應商選擇/供應商評核/供應商分級及運用",""],["2024/10/29","7","7","1","林俊雄","採購與供應商管理策略","分組桌遊","現代藝術(MODERN ART)桌遊模擬",""],["2024/10/30","5","6","2","林俊雄","採購與供應商管理策略","分組桌遊","現代藝術(MODERN ART)桌遊模擬",""],["2024/11/05","7","7","1","林俊雄","採購與供應商管理策略","分組桌遊","現代藝術(MODERN ART)桌遊模擬",""],["2024/11/06","5","6","2","林俊雄","採購與供應商管理策略","分組桌遊","現代藝術(MODERN ART)桌遊模擬",""],["2024/11/12","7","7","1","林俊雄","VMI管理個案","團體討論並撰寫學習單","案例研討",""],["2024/11/13","5","6","2","林俊雄","VMI管理個案","團體討論並撰寫學習單","案例研討",""],["2024/11/19","7","7","1","林俊雄","料庫規劃及儲存管理","分組填寫目標學習單、分組角色扮演報告","料庫規劃/料庫儲存作業",""],["2024/11/20","5","6","2","林俊雄","料庫規劃及儲存管理","分組填寫目標學習單、分組角色扮演報告","料庫規劃/料庫儲存作業",""],["2024/11/26","7","7","1","林俊雄","發料管理實務個案","團體討論並撰寫學習單","案例研討",""],["2024/11/27","5","6","2","林俊雄","發料管理實務個案","團體討論並撰寫學習單","案例研討",""],["2024/12/03","7","7","1","林俊雄","驗收管理","分組填寫目標學習單、分組角色扮演報告","進料作業/檢驗作業/領、發料作業/材料盤點作業/退料作業/呆廢料管理",""],["2024/12/04","5","6","2","林俊雄","驗收管理","分組填寫目標學習單、分組角色扮演報告","進料作業/檢驗作業/領、發料作業/材料盤點作業/退料作業/呆廢料管理",""],["2024/12/10","7","7","1","林俊雄","驗收管理實務個案","團體討論並撰寫學習單","案例研討",""],["2024/12/11","5","6","2","林俊雄","驗收管理實務個案","團體討論並撰寫學習單","案例研討",""],["2024/12/17","7","7","1","林俊雄","付款管理","分組填寫目標學習單、分組角色扮演報告","內購付款作業流程/付款進度管制及應注意事項",""],["2024/12/18","5","6","2","林俊雄","付款管理","分組填寫目標學習單、分組角色扮演報告","內購付款作業流程/付款進度管制及應注意事項",""],["2024/12/24","7","7","1","林俊雄","供應鏈管理","分組填寫目標學習單、分組角色扮演報告","台塑企業供應鏈發展/供應鏈集貨作業",""],["2024/12/25","5","6","2","林俊雄","供應鏈管理","分組填寫目標學習單、分組角色扮演報告","台塑企業供應鏈發展/供應鏈集貨作業",""],["2024/12/31","7","7","1","林俊雄","供應鏈管理","分組填寫目標學習單、分組角色扮演報告","台塑企業供應鏈發展/供應鏈集貨作業",""],["2025/01/01","5","6","2","林俊雄","元日","","休假一天",""],["2025/01/07","7","7","1","林俊雄","期末評量","","期末評量學習成果",""],["2025/01/08","5","6","2","林俊雄","期末評量","","期末評量學習成果",""]]}