{"course":{"id":"113121506301","name":"系統分析與設計","enroll_type":"選修","general_type":"","dept":"四技工管系","grade":2,"class_group":"甲","teacher":"邱慧怡","credit":3,"hour":3,"time":[{"day":1,"section":[5,6]},{"day":2,"section":[7]}],"classroom":"","max":50,"min":10,"remark":"甲乙合班","alt_for":"","courses":""},"detail":[["指定教材","余顯強、傅詠絮,系統分析與設計－使用 UML,全華,\n2024/02/21"],["參考教材",""],["成績評量標準","期中考 25%\n期中專題發表 25%\n期末專題發表 40%\n平時成績10%"],["教學方法","理論講授,實務講授,個案分析,分組實驗(實作)"],["教學目標","以物件導向技術為主軸，輔以UML為塑模工具來闡述有關近代資訊系統開發之方法。從基本觀念到開發模式的歷史演進與特性讓同學可以掌握各類型開發模式的特性與脈絡。\n使用UML視圖，從基礎定義、圖示意義、圖形組合到使用時機，對應系統分析與設計的每個關鍵點。最後結合實務經驗，以物件導向的觀點進行分析與設計，進而產出符合物件導向技術的文件。"]],"office_time":[["邱慧怡","Tue:10.00-12.00\nFri:10.00-12.00"]],"schedule":[["2024/09/09","5","6","2","邱慧怡","系統分析與設計概念","","簡介",""],["2024/09/10","7","7","1","邱慧怡","系統分析與設計概念","分組","簡介",""],["2024/09/16","5","6","2","邱慧怡","結構化開發模式","","開發模式",""],["2024/09/17","7","7","1","邱慧怡","資訊系統發展生命週期","","瀑布模式,漸增模式",""],["2024/09/23","5","6","2","邱慧怡","資訊系統發展生命週期","","雛型模式,螺旋模式,同步模式",""],["2024/09/24","7","7","1","邱慧怡","物件導向系統開發模式","","物件導向的源起",""],["2024/09/30","5","6","2","邱慧怡","物件導向系統開發模式","","物件導向程式語言的特性，敏捷開發",""],["2024/10/01","7","7","1","邱慧怡","物件導向系統開發模式","進度報告","Scrum & RUP",""],["2024/10/07","5","6","2","邱慧怡","統一塑模語言","","UML 簡介",""],["2024/10/08","7","7","1","邱慧怡","統一塑模語言","","UML 的組成",""],["2024/10/14","5","6","2","邱慧怡","統一塑模語言","","事物 & 擴充機制",""],["2024/10/15","7","7","1","邱慧怡","UML關係","","關聯關係",""],["2024/10/21","5","6","2","邱慧怡","UML關係","","依賴關係,關係符號",""],["2024/10/22","7","7","1","邱慧怡","UML 基礎圖形符號","","參與者與使用案例",""],["2024/10/28","5","6","2","邱慧怡","UML 類別與物件","","類別的特定圖示",""],["2024/10/29","7","7","1","邱慧怡","","","訊息,介面,  動作與活動,事件",""],["2024/11/04","5","6","2","邱慧怡","期中報告","","期中報告",""],["2024/11/05","7","7","1","邱慧怡","期中考","","期中考",""],["2024/11/11","5","6","2","邱慧怡","UML 結構塑模視圖","","視圖概觀",""],["2024/11/12","7","7","1","邱慧怡","UML 結構塑模視圖","","部署圖",""],["2024/11/18","5","6","2","邱慧怡","UML行為塑模視圖","","循序圖",""],["2024/11/19","7","7","1","邱慧怡","UML行為塑模視圖","","循序圖常用的互動運算子",""],["2024/11/25","5","6","2","邱慧怡","專案管理","進度報告","專案管理知識體系",""],["2024/11/26","7","7","1","邱慧怡","專案管理","","範例",""],["2024/12/02","5","6","2","邱慧怡","專案確認與組織","","專案立案,可行性分析,人事,準備與規劃",""],["2024/12/03","7","7","1","邱慧怡","專案確認與組織","","範例",""],["2024/12/09","5","6","2","邱慧怡","系統需求調查","","分析模型",""],["2024/12/10","7","7","1","邱慧怡","系統需求調查","","範例",""],["2024/12/16","5","6","2","邱慧怡","系統需求分析","","使用案例設計原則,撰寫使用案例",""],["2024/12/17","7","7","1","邱慧怡","系統需求分析","","範例",""],["2024/12/23","5","6","2","邱慧怡","系統設計","進度報告","由分析進入設計",""],["2024/12/24","7","7","1","邱慧怡","使用介面設計","","介面與互動設計",""],["2024/12/30","5","6","2","邱慧怡","資料庫設計","","資料庫設計實務",""],["2024/12/31","7","7","1","邱慧怡","開發與交付","","實作 & 測試",""],["2025/01/06","5","6","2","邱慧怡","期末報告","","期末報告",""],["2025/01/07","7","7","1","邱慧怡","期末報告","","期末報告",""]]}