{"course":{"id":"112121707601","name":"專案管理","enroll_type":"選修","general_type":"","dept":"四技工管系","grade":3,"class_group":"甲","teacher":"林俊雄","credit":3,"hour":3,"time":[{"day":3,"section":[2,3,4]},{"day":4,"section":[5,6,7]}],"classroom":"","max":30,"min":10,"remark":"甲乙合班 帶狀課程 7/3~9/1","alt_for":"","courses":""},"detail":[["指定教材","1.賴奎魁，張善斌，吳宜錚，2023。專案管理 (Larson/ Project Management: The Managerial Process 8e)，8 版，華泰，台北市。\n2.業師演講教材(ChatGPT/專案管理實務)"],["參考教材","1.台塑企業麥寮六輕簡介，https://www.fpg.com.tw/tw/media/about/15/20/44\n2.科學園區探索館，https://web.sipa.gov.tw/explore/index.do"],["成績評量標準","期中/末測驗40%(MAX*25%+Min*15%)\n課程參與成績 10%\n分組報告 35%\n個人作業 15%"],["教學方法",""],["教學目標","旨在培養學生成為未來的專案管理人才，以利從事企業各種專案性質的任務，構建所需專案相關管理流程與範疇。包括企業專案規劃從專案產生源由，定義專案範圍，預估專案任務所需的成本與時間，可能的風險、所需的資源及時程分析，以滿足內外部顧客在預算、交期及功能限制下，能如期、如價及如質的執行及控制專案任務，進而經驗後續參照，達成專案目標。"]],"office_time":[["林俊雄","昇期二上午9:00-16:00"]],"schedule":[["2023/07/05","2","4","3","林俊雄","課程介紹/專案管理現況","上網查詢與專案有關之議題","教學進度,課程目的,課程架構/起源,背景,與時增進變化","可參考六輕簡介或科學園區探索館"],["2023/07/06","5","7","3","林俊雄","專案與組織策略的關聯","分組_構想/主題選擇與評估/組織","與企業組織經營策略的關係,如何選擇專案的方法",""],["2023/07/12","2","4","3","林俊雄","專案定義及範疇","分組_專案目標及分工","專案範圍,執行優先順序選擇,WBS,OBS",""],["2023/07/13","5","7","3","林俊雄","專案時間成本預估","","進度及成本估計方法介紹",""],["2023/07/19","2","4","3","林俊雄","發展專案計劃","","專案執行網路圖的規劃及計算",""],["2023/07/20","5","7","3","林俊雄","發展專案計劃","個人作業(網路圖)","專案執行網路圖的規劃及計算",""],["2023/07/26","2","4","3","林俊雄","專案的風險管理","分組_風險管理","風險起源, 評估及控制",""],["2023/07/27","5","7","3","林俊雄","專案資源時程計劃","","排定資源後,專案網路圖的進度控制",""],["2023/08/02","2","4","3","林俊雄","專案資源時程計劃","個人作業(資源排程)","排定資源後,專案網路圖的進度控制",""],["2023/08/03","5","7","3","林俊雄","專案管理實務演講","","實務專案分享","業師依實際時程調整"],["2023/08/09","2","4","3","林俊雄","期中測驗","開書考","驗證學習成果",""],["2023/08/10","5","7","3","林俊雄","生成式AI工具導入","","Chat GPT工具介紹","業師依實際時程調整"],["2023/08/16","2","4","3","林俊雄","縮短專案工期","","考量直接及間接成本下進度的縮短",""],["2023/08/17","5","7","3","林俊雄","縮短專案工期","個人作業","考量直接及間接成本下進度的縮短",""],["2023/08/23","2","4","3","林俊雄","生成式AI工具運用","分組_報告","Chat GPT工具應用","業師依實際時程調整"],["2023/08/24","5","7","3","林俊雄","專案進度績效衡量評估","個人作業","比較基準及實際進度產值的計算",""],["2023/08/30","2","4","3","林俊雄","期末報告","問卷","分組報告Chat GPT輔助專案成果",""],["2023/08/31","5","7","3","林俊雄","期末測驗","開書考","驗證學習成果",""]]}