{"course":{"id":"108221401601","name":"工作研究(含實習)","enroll_type":"必修","general_type":"","dept":"四技工管系","grade":1,"class_group":"甲","teacher":"張仁履","credit":3,"hour":5,"time":[{"day":2,"section":[5,6,7]},{"day":3,"section":[7,8]}],"classroom":"","max":60,"min":10,"remark":"","alt_for":"","courses":""},"detail":[["指定教材","Benjamin Niebel & Andris Freivalds 原著,13e\n王明揚與林迪意編譯，工作研究 東華書局, 台北市, 2015"],["參考教材","Fred E. Meyers, James R. Stewart原著\nMotion and Time Study for Lean Manufacturing, 3rd ed.張東孟 藍俊雄 編譯，工作研究\n高立圖書有限公司, 台北市, 2002"],["成績評量標準","期中考成績  25%\n期末考成績  25%\n實習作業與實習測驗 40%\n平時成績   10%"],["教學方法","實務講授,分組實驗(實作)"],["教學目標","使學生了解工作研究之重要性,及工作改善方法.配合案例解說,學生能體會其應用之可行性."]],"office_time":[["張仁履","星期三,下午1:00-3:00\n其他時間(請使用email預約)"]],"schedule":[["2020/02/04","5","7","3","張仁履","工作研究概論","","概論",""],["2020/02/05","7","8","2","張仁履","工作研究概論","","概論",""],["2020/02/11","5","7","3","張仁履","工作方法、標準及設計","","生產力的重要性",""],["2020/02/12","7","8","2","張仁履","工作方法、標準及設計","","生產力的重要性",""],["2020/02/18","5","7","3","張仁履","解決問題的工具","實習1","流程圖的介紹與應用",""],["2020/02/19","7","8","2","張仁履","解決問題的工具","","流程圖的介紹與應用",""],["2020/02/25","5","7","3","張仁履","操作分析","實習2","",""],["2020/02/26","7","8","2","張仁履","操作分析","","",""],["2020/03/03","5","7","3","張仁履","人力操作及設計","","動作經濟原則",""],["2020/03/04","7","8","2","張仁履","人力操作及設計","","動作經濟原則",""],["2020/03/10","5","7","3","張仁履","人力操作及設計","實習3","",""],["2020/03/11","7","8","2","張仁履","人力操作及設計","","",""],["2020/03/17","5","7","3","張仁履","人因工程考量","","工作環境對工人的影響",""],["2020/03/18","7","8","2","張仁履","人因工程考量","","工作環境對工人的影響",""],["2020/03/24","5","7","3","張仁履","實例計算","","生產線平衡",""],["2020/03/25","7","8","2","張仁履","實例計算","","生產線平衡",""],["2020/03/31","5","7","3","張仁履","期中考","","",""],["2020/04/01","7","8","2","張仁履","期中考","","",""],["2020/04/07","5","7","3","張仁履","實施新方法","實習4","",""],["2020/04/08","7","8","2","張仁履","實施新方法","","",""],["2020/04/14","5","7","3","張仁履","時間研究","","時間與成本的關係",""],["2020/04/15","7","8","2","張仁履","時間研究","","時間與成本的關係",""],["2020/04/21","5","7","3","張仁履","評比寬放","實習5","",""],["2020/04/22","7","8","2","張仁履","評比寬放","","",""],["2020/04/28","5","7","3","張仁履","預定時間系統","","MTM系統應用",""],["2020/04/29","7","8","2","張仁履","預定時間系統","","MTM系統應用",""],["2020/05/05","5","7","3","張仁履","工作抽查","實習6","",""],["2020/05/06","7","8","2","張仁履","工作抽查","","",""],["2020/05/12","5","7","3","張仁履","實例計算","","工作抽查制定時間標準",""],["2020/05/13","7","8","2","張仁履","實例計算","","工作抽查制定時間標準",""],["2020/05/19","5","7","3","張仁履","間接與管銷人工標準","","",""],["2020/05/20","7","8","2","張仁履","間接與管銷人工標準","","",""],["2020/05/26","5","7","3","張仁履","訓練與其他管理實務","","",""],["2020/05/27","7","8","2","張仁履","訓練與其他管理實務","","",""],["2020/06/02","5","7","3","張仁履","期末考","","",""],["2020/06/03","7","8","2","張仁履","期末考","","",""]]}